Compressed Bio Gas Plant Mechanical Engineering

₹75000-150000 INR

Posted 1 minute ago

•

Ends in 6 days

₹75000-150000 INR

Paid on delivery

I’m putting together a full design package for a green-field biogas facility that will process more than 50 t/day of Napier grass (or similar energy crops) and upgrade the gas to >90 % pure Bio-CNG. To move from concept to construction I need a process engineer—or a small interdisciplinary team—to translate my production targets into a fully engineered solution that can be handed straight to EPC contractors and automation vendors. The scope begins with the biology. I will supply rough feed analyses; you will calculate the organic loading rate, hydraulic retention time, expected gas yield, nutrient balance, and mixing power for a continuously stirred tank reactor (CSTR) train. From those figures we’ll finalise digester volume, agitation duty, heating loops, and any necessary feed pre-treatment. Once the raw biogas numbers are set, the job expands into purification. Please size and specify an economical PSA, water-scrubbing, or membrane system—your choice, so long as it consistently strips CO₂, H₂S, and moisture to reach the 90 % + methane spec. Utility demands, media consumption, and expected skid footprints have to be part of the package. Mechanical and instrumentation detail is essential. I need complete PFDs and P&IDs, line lists, datasheets for slurry pumps, heat exchangers, flare, blowers, flow meters, analysers, and safety valves. Every piece should close out a mass- and energy-balance so the numbers reconcile. Because the plant will run largely unattended, a high-level PLC/SCADA narrative is also required. Describe temperature control loops, pH and pressure interlocks, emergency shutdown logic, and the commissioning sequence needed to start the biology safely the first time. Deliverables (all native files plus PDFs): • Block flow diagram, PFD, heat & material balance • P&IDs with annotated equipment and instrument tags • Equipment sizing calculations and datasheets • Gas upgrading package sizing and vendor recommendations • Control philosophy and PLC/SCADA I/O list • Commissioning and biological start-up plan Drawings can be produced in AutoCAD P&ID or similar; calculations in Excel, ASPEN, or your preferred process software, as long as assumptions are transparent. If you’ve taken at least one large-scale digester from design through commissioning, especially with fibrous energy crops, I’d like to see that experience reflected in your proposal along with a rough timeline to first draft.

Project ID: 40817455

About the project

1 proposal

Open for bidding

Remote project

Active 23 secs ago

Place your bid

Bid amount Email address

Benefits of bidding on Freelancer

Set your budget and timeframe

It's free to sign up and bid on jobs

1 freelancer is bidding on average ₹93,800 INR for this job

User Avatar
Flag of POLAND

The Compressed Bio Gas plant package starts with one Excel digester workbook. Every feed assumption sits in a visible input cell before any PFD is drawn. 1. We have not taken a large-scale digester from design through commissioning. Our work is AI-assisted process calculation and drafting, so your licensed engineer should review and sign the package before it goes to EPC contractors. The first milestone takes 4 working days after the feed analyses arrive. The first draft of the full package takes 12 working days. The first milestone is 8333.33 INR and is part of the total. It covers the CSTR workbook: OLR, HRT, gas yield, nutrient balance and mixing power. It is accepted when the mass balance reconciles in a check row. The remaining 85466.67 INR covers the PFD, P&IDs, datasheets, upgrading sizing, I/O list and start-up plan in later milestones, with 2 revision rounds. Please send the rough feed analyses. Price: 93800 INR fixed · Timeline: 12 working days from access/brief Konrad

内容来自 Freelancer News,版权归原作者所有。

阅读原文 ↗

用 HomepageTab 新标签页关注 RSS,打开浏览器就能看到更新。

安装 HomepageTab