Faisalabad-Lahore Rail Link to Resume on November 15 After Flood Damage Repairs
Pakistan Railways rebuilt damaged track and bridge infrastructure at an estimated cost of Rs455 million. FCCI President Arif Ehsan Malik welcomed the restoration and urged the government to add faster trains and double the track.
FAISALABAD, (Pakistan Point News - 12th Nov, 2026) President Faisalabad Chamber of Commerce & Industry (FCCI) Arif Ehsan Malik has welcomed the decision by Pakistan Railways to restore the rail link between Faisalabad and Lahore, effective from November 15, 2026.
FCCI President urged the Ministry of Railways to introduce high-speed, non-stop trains on this route to accommodate the high volume of business commuters and cargo transit between the two industrial hubs.
Alongside the request for fast trains, the FCCI leadership strongly demanded the immediate dualization of the Faisalabad-Lahore track, emphasizing that a double-track system is essential to permanently eliminate operational delays and safely expand both passenger and freight traffic capacity.
He said that the rail link had been suspended since August 2026 due to extensive infrastructure damage including the collapse of the Massan Kalar Bridge near Sheikhupura caused by severe flooding.
He said that Pakistan Railways completed the reconstruction of the track and bridge infrastructure at an estimated cost of Rs.455 million.
The resumption of operations on the Shahdara-Sheikhupura-Faisalabad section is expected to recover key revenue streams for the state railway, which considers this corridor one of its most commercially viable routes, he added.
Meanwhile, President FCCI has also thanked the railway minister for restarting the Shalimar Express between Lahore and Karachi via Faisalabad from November 15, 2026.
内容来自 UrduPoint News,版权归原作者所有。
阅读原文 ↗