Industrial Power Factor Correction

₹1500-12500 INR

Posted 1 minute ago

•

Ends in 6 days

₹1500-12500 INR

Paid on delivery

Our plant is seeing noticeable utility penalties and a spike in electricity costs, and I suspect a low power factor is the culprit. I need a qualified power factor engineer who can come on-site, measure our present PF, propose the right correction strategy, supply or specify the proper capacitor banks / filters, install them, and finally verify the results under load. Because I’m not sure whether our issues stem from the low-voltage panels that feed the machines, the medium-voltage distribution, or both, the assignment begins with a full assessment. Bring your own power-quality analyser, clamp meters, and any diagnostic tools you rely on. After the measurements you will: • Recommend the optimal correction equipment sized for our actual demand and harmonic profile. • Handle or supervise installation so it meets local electrical codes and our plant’s safety standards. • Test the system in real time, document the new power factor, and demonstrate that we are within our utility’s target (≥0.95 lagging). • Deliver a concise report showing before-and-after readings, settings, and maintenance guidance. I’ll provide full access to switchboards, historical utility data, and my maintenance crew for isolation and shutdowns. Timing is flexible but I’d like the entire assessment-to-commissioning cycle completed within three weeks of kickoff. If you have experience cutting PF penalties for manufacturing sites and can back it up with references, let’s talk.

Project ID: 40814279

About the project

Open for bidding

Remote project

Active 57 yrs ago

Place your bid

Bid amount Email address

Benefits of bidding on Freelancer

Set your budget and timeframe

It's free to sign up and bid on jobs

内容来自 Freelancer News,版权归原作者所有。

阅读原文 ↗

把喜欢的内容,留在你的新标签页。

打开我的订阅