Cost-Effective Metal Building Strategy
THIS IS JUST CASE STUDY AND DISCUSSION WITH CITY OF PHOENIX PRE DEVELOPMENT DISCUSSION; AIM IS COSTING AND BEST METHOD TO CONSTRUCT EITHER WITH NEW MATERIALS OR REPURPOSED MATERIALS. YOUR BID WILL BE FINAL... (Budget: $30 - $250 USD, Jobs: 3D Modelling, Architectural Engineering, Building Design, CAD/CAM, Construction, Electrical Engineering, Mechanical Engineering, Project Management, Solidworks, Structural Engineering)
内容来自 Freelancer News,版权归原作者所有。
阅读原文 ↗