Mitsubishi PLC Alarm Integration
I want to strengthen the safety layer of an existing ammonia–glycol chilling unit by adding a dedicated monitoring and alarm package in the Mitsubishi PLC. The refrigeration sequence itself is running... (Budget: ₹12500 - ₹37500 INR, Jobs: Alarm Systems, Automation, Electrical Engineering, Electronics, Industrial Engineering, Microcontroller, PLC, Wireless)
内容来自 Freelancer News,版权归原作者所有。
阅读原文 ↗