Low-Mass Gas Boiler Design Needed

$250-750 USD

Posted 1 minute ago

•

Ends in 6 days

$250-750 USD

Paid on delivery

My existing hydronic system needs a fresh, low-mass boiler layout that runs on natural gas and feeds my baseboard radiators for space-heating only—no domestic hot-water integration this time. I’ll provide the current boiler specs, piping photos, and room-by-room heat-loss data as soon as we start. What I need from you is a clear, code-compliant replacement design: proper sizing calculations, updated piping and venting schematics, pump selection, control strategy, and a parts list I can hand directly to my installer. Please base everything on modern high-efficiency, low-water-content equipment, and make sure the design plugs into the existing distribution loop with minimal disruption. Final deliverable: a PDF drawing set (plans and details) plus a concise narrative and equipment schedule in editable format.

Project ID: 40810566

About the project

14 proposals

Open for bidding

Remote project

Active 9 secs ago

Place your bid

Bid amount Email address

Benefits of bidding on Freelancer

Set your budget and timeframe

It's free to sign up and bid on jobs

14 freelancers are bidding on average $473 USD for this job

User Avatar
Flag of UKRAINE

Hello, My 10+ years in electrical engineering, industrial control systems, and equipment integration make me well suited to develop a clear, installer-ready boiler replacement design. I work extensively with schematics, component selection, electrical protection, control systems, relays, sensors, and integration of existing mechanical and electrical systems, skills directly relevant to pump selection, control strategy, and connection to your current hydronic loop. My experience covers complete engineering documentation from system architecture and schematic design through commissioning and troubleshooting. I can apply that practical, systems-level approach to the required sizing calculations, piping and venting schematics, equipment schedule, parts list, concise narrative, and editable drawing documentation, while keeping the design focused on natural-gas space heating and minimal disruption to the existing distribution system. I would be glad to bring my electrical engineering and industrial systems experience to this replacement design and provide a professional PDF drawing set with the accompanying editable documentation. Thanks!

User Avatar
Flag of UKRAINE

Hello, My 15+ years of engineering experience spans complex hardware design, mechanical design, simulation, and industry-standard technical documentation, useful foundations for producing a clear boiler replacement drawing set and equipment schedule. Although my primary specialization is electronic hardware and firmware, my skills also include Electrical Engineering and Mechanical Design, with experience taking projects from concept through production while maintaining compliance with applicable standards. I can apply that disciplined engineering approach to organize your heat-loss inputs, equipment and pump selections, piping and venting schematics, control documentation, parts list, and editable narrative alongside the final PDF set. I would be glad to contribute precise, well-structured engineering documentation for your installer and support the project with careful technical communication. Thanks!

User Avatar
Flag of UKRAINE

Hi there, What boiler make and model is currently installed, and what flue path or vent termination constraints should the new layout respect? Also, are your baseboard zones already separated with a single circulator or zone valves? The main task is to replace the current system with a low-water-content, natural-gas boiler that ties into the existing hydronic loop with minimal changes. I would size the boiler from your heat-loss data, then draft a clean piping concept with primary details, venting, pumps, and a control sequence that matches space-heating only. One risk is mismatching the boiler’s flow and minimum turn-down with the existing distribution, which can cause short cycling or noisy operation. That is usually solved by checking delta-T, minimum flow, and zone behavior early, then choosing the pump and piping arrangement around those numbers. Once the field data is in hand, I can prepare the drawing set, equipment schedule, and a parts list in editable form, with notes that your installer can follow directly. The deliverable will be code-compliant and focused on practical installation details, not just a concept sketch. Which part of the old boiler room should stay unchanged, and what would you like the new layout to improve most? Best, Hlib

User Avatar
Flag of UNITED STATES

Hello, My HVAC and mechanical design experience is directly aligned with developing a practical replacement boiler system for your existing hydronic baseboard loop. I provide residential and commercial MEP layouts, code-compliance review, and permit-ready drawing sets, with a focus on integrating building systems cleanly and minimizing disruption to existing infrastructure. Using your current boiler information, piping documentation, and room-by-room heat-loss data, I can prepare the requested sizing calculations, piping and venting schematics, pump selection, control strategy, equipment schedule, and installer-ready parts list for a natural-gas, high-efficiency low-water-content boiler serving space heating only. My Revit and AutoCAD experience supports clear PDF plans and details, while my broader engineering background helps ensure the design is coordinated, practical, and suitable for code review. I am ready to deliver a clear editable narrative and equipment schedule alongside the drawing set, and I would be glad to bring this boiler replacement design to completion. Thanks!

User Avatar
Flag of UNITED STATES

Hi, Dear. I am a licensed Professional Engineer experienced in MEP and HVAC design for construction projects. ✅ HVAC layouts and equipment schedules ✅ CAD construction documentation I will provide coordinated drawings and specifications. Send me message to discuss in detail.

User Avatar
Flag of UNITED STATES

Hello, Your boiler replacement requires careful engineering to fit the existing hydronic distribution while addressing sizing, piping, controls, venting, and code compliance. As a Senior Civil & Structural Engineer with over 10 years of experience delivering permit-ready plan sets, engineering calculations, and supporting documentation for residential, commercial, and industrial projects, I bring the technical discipline needed for a clear, practical design package. My background in hydraulic and hydrologic calculations, utility planning, structural analysis, and detailed drawing production supports accurate documentation and coordination with the existing system. I can prepare a professional PDF drawing set with plans and details, a concise narrative, equipment schedule, pump and piping information, control strategy, and parts list in an editable format. I will keep the design focused on natural-gas space heating, high-efficiency low-water-content equipment, and minimal disruption to the existing loop. I am committed to accurate, code-compliant, cost-effective engineering documentation that your installer can use confidently. Choose me for a professional boiler design package developed with practical field installation in mind. Thanks!

User Avatar
Flag of UNITED STATES

✅ Hi, there! ✅ You need a code-compliant, low-mass natural-gas boiler replacement that ties cleanly into your existing hydronic loop for baseboard space heat only, and I can produce the full installer-ready PDF drawing set. ✔ My deliverables for you will be: * Proper boiler sizing and heat-loss based load targeting * Updated piping + venting schematics (high-efficiency, low-water-content approach) * Pump selection, piping layout notes, and control strategy * Parts/equipment schedule plus editable narrative (for your installer) I’ll design around your provided boiler specs, piping photos, and room-by-room heat-loss data, then generate clear plans/details and a concise narrative that focuses on minimal disruption to the existing distribution loop. Best regards, Mike

User Avatar
Flag of UNITED STATES

Hi there, Your existing hydronic system needs a properly sized, low-water-content natural-gas boiler replacement that integrates with the baseboard loop while avoiding unnecessary domestic-hot-water complexity. The deliverables must be installer-ready: heat-loss-based sizing, piping and venting schematics, pump selection, controls, equipment schedule, parts list, and editable documentation alongside the PDF drawing set. I have strong hands-on experience with Engineering, Electronics, and Electrical Engineering and have solved similar problems involving hydronic system integration, equipment selection, and control strategy development. My approach would be to: * Review the existing boiler specifications, piping photos, heat-loss data, and current implementation. * Identify the root cause of any sizing or integration concerns and determine what can be reused versus what needs to be changed. * Implement a clean, maintainable solution using low-mass condensing boiler technology, hydronic design principles, and coordinated electrical controls. * Test edge cases, reliability, performance, safety, code alignment, and integration behavior. * Deploy or integrate the design documentation without disrupting the existing system. A low-mass boiler must be protected from short cycling and inadequate flow, so minimum-flow requirements, primary-secondary behavior where needed, outdoor reset, and pump control will be verified against the selected equipment. I prefer fixing the actual ro

User Avatar
Flag of UNITED STATES

Awesome! I’ve handled similar hydronic heating design projects, and I can help you develop a code-compliant, low-mass natural-gas boiler replacement for your existing baseboard system. I’ll focus on accurate heat-loss-based sizing, efficient piping and venting, pump selection, controls, and a practical equipment schedule that integrates with the current distribution loop with minimal disruption. I’ve got some thoughts I’d like to apply so the PDF drawing set, editable narrative, schematics, and parts list are clear for your installer while supporting reliable operation with modern high-efficiency, low-water-content equipment. Best regards, Robert

内容来自 Freelancer News,版权归原作者所有。

阅读原文 ↗

把喜欢的内容,留在你的新标签页。

打开我的订阅