3 ways to keep experimentation alive as your company grows
One of the most useful failures of my career took 18 months.
As chief product officer at Hily, I guide the team behind our dating app. A few years back, we took a leap and added live streaming. Streaming was taking off, and combining live video with dating seemed worth testing. But by the time we concluded it wasn’t going to deliver the growth we hoped for, we had spent a year and a half trying to make it work.
Earlier in Hily’s history, I doubt it would have taken us that long.
Back then, we were relentless experimenters. We tinkered with onboarding flows, paywalls, prices, ads, and new ways to attract users. If something sparked interest, we jumped in. If users shrugged, we pivoted without hesitation.
Take Snapchat, for example. Few dating apps dared to advertise there, but our experiments revealed that UGC-style ads (user-generated content) resonated with Gen Z. That single insight flipped our fortunes from losing money per user to racking up more than a million downloads each month.
Then, over several months, we hired around 100 people. We had more engineers, analysts, product managers, and specialists. Experiments started taking longer. By the time we had results, we had often invested enough time and effort that walking away became harder.
That’s exactly what happened with live streaming. Somewhere along the line, our experiment turned into a full-blown strategy. That experience reshaped how we build teams and how I approach experimentation. Growth should fuel more testing, not turn every small idea into a mountain to climb.
1. Avoid turning experiments into commitments
Before we build anything now, I want the team to be able to answer a few questions out loud. The first one is always: What are we actually trying to learn? Then, what would a good result look like? And what would tell us it’s not working and we should stop? How much time, team effort, or budget are we willing to invest before seeing those results?
Without those answers, an experiment can turn into a Manhattan Project. Not every initiative needs a hard deadline. But every test should eventually reach a point where the team looks at the evidence and decides whether another week, another engineer, or another dollar is justified.
2. Match approval levels to the cost of failure
When we realigned Hily to focus on the dating app, we also made some changes to the organization, moving toward smaller cross-functional teams. Instead of passing work from one function to another, we created small units with product, analytics, design, engineering, and quality assurance. Each unit has its own focus and ownership area. Sometimes I am not even aware of the experiments that the teams are running, and I am fine with that.
What is important to me is understanding what the cost of failure is. If it’s a few days of work with a limited budget, I shouldn’t be a gatekeeper. The team has the right to test out and then report on the results. Some things are not negotiable, though. Initiatives that involve payments, privacy, significant infrastructure cost, or reputational risks should always be preapproved.
The biggest risk with approvals is turning them into a rigid process. That’s what happens when organizations get bigger and lose their experimentation culture. To keep it alive, the level of approval should match the cost of failure.
3. Get rid of bottlenecks
There are three timelines leaders should watch: how long it takes to approve the experiment, how long it takes to build it, and how quickly we can get the evidence. All three are equally important, and a roadblock in any one of them can slow learning down.
To understand where your own bottleneck lies, analyze the last 10 experiments. How much time did you spend building them and waiting for approvals and handoffs? If an experiment takes three days to launch but three weeks to approve, the issue is obvious. Most often, the biggest red flags are low-risk tests bogged down by heavy approval. These are prime spots to cut friction and speed things up without adding much risk.
Live streaming didn’t bring the growth we’d dreamed of. Instead, we came away from those 18 months with stronger teams and a better feel for when an experiment has run its course.
Some experiments are bound to fail, but that’s no longer the real problem in my eyes. The real danger is taking too long to find out. Strong teams swing big, learn quickly, and never waste a lesson. And company growth should give teams more chances to learn, not more reasons to wait.