Complete MEP Drawings for Mall Stores
I have several new retail spaces in a shopping mall, each ranging from about 1,000 – 1,500 sq ft, and I need a full drawing package for every un…
₹12500-37500 INR
Posted 1 minute ago
•
Ends in 6 days
₹12500-37500 INR
Paid on delivery
I have several new retail spaces in a shopping mall, each ranging from about 1,000 – 1,500 sq ft, and I need a full drawing package for every unit. The scope covers electrical, air-conditioning, fire and smoke systems, produced from scratch because the shops are still empty shells. What I can supply right away: • the mall’s overall floor plan with exact shop measurements • each shop’s floor plan showing ceiling heights and existing utility points • an architectural layout that already indicates furniture, fixtures and equipment locations once the fit-out is complete Using those references, the deliverables I need are: 1. Electrical set – lighting, power distribution, panel schedules and load calculations ready for mall management review. SLD & Load Sheet 2. HVAC set – duct routes, diffuser locations, equipment sizing and any fresh-air requirements coordinated with the ceiling grid. Heat load calculations 3. Fire & smoke set – sprinkler layout, detector placement, alarm cabling and smoke-control notes compliant with local code. Final files should come in editable AutoCAD (DWG) plus stamped PDFs suitable for permit or landlord approval. Please be sure everything aligns with the supplied dimensions and reflects practical cable/duct routing within the available ceiling space. Once the first store is signed off, the same approach will roll out to additional units, so a clear, repeatable drawing standard is appreciated.
Project ID: 40838425
About the project
3 proposals
Open for bidding
Remote project
Active 6 secs ago
Place your bid
Bid amount Email addressBenefits of bidding on Freelancer
Set your budget and timeframe
It's free to sign up and bid on jobs
3 freelancers are bidding on average ₹17,668 INR for this job


Hi there! I have read your project brief for the MEP drawing packages for your mall retail units. Trygve Studio's expertise is architecture, interiors and product development, with a team of architects, engineers and 3D visualizers. We will approach this project by reviewing your provided architectural layouts and utility points to draft the required electrical, HVAC, and fire safety plans in AutoCAD. Please note that we do not provide structural engineering or complex MEP calculations, so those specific elements are excluded from our scope. Please have a look at our profile: https://www.freelancer.com/u/faisal8071 Regards, Trygve Studio


My experience with AutoCAD drafting, HVAC design, lighting design and BIM-based work aligns directly with producing coordinated MEP drawings for your mall retail units. I can develop clear, editable DWG documentation from the supplied shell dimensions, utility points, ceiling heights and architectural layouts. My background in architectural working drawings, commercial interior design and 2D/3D modelling supports practical coordination of lighting, power, air-conditioning and ceiling elements within each limited retail space. I also work with Revit and AutoCAD, enabling organized drawing standards that can be repeated across additional stores while keeping layouts, equipment and routing consistent. I would be pleased to prepare a professional, coordinated drawing package for your units and support the project through landlord or permit review.


The critical part of mall MEP design is not just producing individual drawings—it's coordinating electrical loads, HVAC ductwork, and fire-safety systems within limited ceiling space while meeting mall approval requirements. Our team can support the complete drawing package for your retail units, including electrical layouts, SLDs, panel schedules, load calculations, HVAC duct routing, diffuser placement, heat-load calculations, and fire alarm, sprinkler and smoke-control layouts. We understand the importance of accurate coordination with architectural layouts, existing utility points, ceiling heights, and landlord requirements. We can also establish a consistent drawing standard for the first approved store so subsequent units follow the same approach. We'll need to confirm the applicable local codes and professional stamping requirements before finalizing the approval-ready DWG and PDF deliverables. **Could you share the mall's MEP design guidelines and confirm which local authority's codes and stamping requirements apply?** Add a stronger mall approval workflowClarify included MEP deliverables
内容来自 Freelancer News,版权归原作者所有。
阅读原文 ↗