WASA Rawalpindi recovers Rs 3.4 million from defaulters

The agency said Rs 1.6 million was recovered from six under-construction buildings, while a further Rs 1.8 million came from unpaid water and sewerage bills. Some water connections were disconnected over non-payment.

RAWALPINDI, (Pakistan Point News - 26th Nov, 2026) The Water and Sanitation Agency (WASA) Rawalpindi on Thursday recovered Rs 3.4 million in operations conducted on IJP Road and Saidpur Road as part of its campaign to recover outstanding dues and strengthen the agency’s financial position.

On the instructions of Managing Director WASA Azizullah Khan, teams led by Senior Special Magistrate Aamir Ashfaq Qureshi, Director Finance and Revenue Tahir Bashir Mirza and Deputy Director Akmal Yasin conducted the operations at various locations.

During the operations, challans were issued to six under-construction buildings for violating departmental regulations and failing to pay outstanding dues, resulting in the recovery of Rs 1.6 million. Another Rs 1.8 million was recovered from defaulters of water and sewerage bills.

Water connections to under-construction buildings were also disconnected over non-payment of dues. The Directorate of Water Supply provided support during the operations.

MD WASA Azizullah Khan directed the concerned officers to intensify recovery operations to achieve the assigned targets and ensure collection of outstanding dues from defaulters.

He said the recovery campaign would continue to improve the Agency’s financial stability and make it self-sustaining.

内容来自 UrduPoint News,版权归原作者所有。

阅读原文 ↗

用 HomepageTab 新标签页关注 RSS,打开浏览器就能看到更新。

安装 HomepageTab