CM Murad orders removal of SBCA chief, suspension of 16 officers over Karachi building collapse

Sindh Chief Minister Murad Ali Shah on Thursday ordered the removal of senior officials, including Waseem Shamshad, who served as both Sindh Building Control Authority (SBCA) director general and local government secretary, and the suspension of 16 SBCA officers following a deadly building collapse near Baloch Colony in Karachi’s Administrative Society. The six-storey under-construction building collapsed on November 25, killing three people and injuring 13 others. Around 30 labourers were reportedly inside when the structure gave way. Initial findings indicated that the building had been approved for a basement, ground floor and one additional storey, but six extra floors had allegedly been constructed. Police detained five people, including the contractor, while the Sindh Building Control Authority suspended six officials. The authorities also sealed 12 other under-construction buildings in the area. Chairing a high-level meeting at CM House, the chief minister expressed strong displeasure over the loss of lives and said negligence that resulted in deaths or caused suffering to the public would not be tolerated. “I will not tolerate any incident that results in the loss of human life or causes suffering to people,” he said, directing the relevant authorities to take immediate action against those responsible. Following a briefing and consultation with the local government minister, Murad directed that Shamshad be surrendered to the federal government for further action, recommended his immediate suspension by the federal government, and ordered a formal inquiry into his role.   Accountability is non-negotiable. Taking strict action over Karachi building collapse, CM Murad Ali Shah has ordered removal & surrender of Waseem Shamshad to Fed Govt, suspension of SBCA officers,arrest of owner, builder. Negligence costing human lives will not be tolerated: CM pic.twitter.com/9tRQm2MPQE — Sindh Chief Minister House (@SindhCMHouse) November 26, 2026 The chief minister also ordered the removal of Deputy Commissioner East Nasrullah Abbasi. On the advice of the home minister, he directed the immediate removal of SSP East Zubair Sheikh over alleged negligence. In addition, Murad ordered the suspension of 16 SBCA officers concerned and directed that an inquiry be conducted to determine responsibility. He warned that any SBCA employee found involved in negligence or misconduct would face strict disciplinary action. Turning to those directly linked to the construction, the chief minister directed the police to immediately arrest the building owner, Salman Tahir, and the builder, Zeeshan. He also instructed the chief secretary to include the building’s architect and structural engineer in the investigation to establish whether the construction had complied with approved plans, building regulations and safety standards. Read: Approved for two floors, built seven - then came the collapse Murad directed all relevant departments and law enforcement agencies to ensure a transparent investigation and said no one responsible for the tragedy should be allowed to escape accountability. He reiterated that public safety must remain the foremost responsibility of every government department and warned that negligence in enforcing building regulations would invite strict action. The meeting was attended by Provincial Ministers Syed Nasir Hussain Shah and Zia-ul-Hassan Lanjar, Karachi Mayor Murtaza Wahab, Chief Secretary Asif Hyder Shah, Commissioner Karachi Hassan Naqvi and other senior officials. Rescue operations continue Meanwhile, the Sindh chief minister’s inspection team visited the site of the building collapse near Baloch Colony. The team, led by member Anwar Sher, collected samples of steel bars and other construction material from the site. Sher declined to comment when approached by the media. The rescue operation to search for people trapped beneath the rubble continued, with Rescue 1122 teams carrying out search and rescue work from two sides of the collapsed building. To improve access to the site, rescuers demolished the wall of a vacant plot adjoining the building’s third side and created an entry route. Heavy machinery was brought in through the plot to help remove debris and support the search operation, a Rescue 1122 Sindh spokesperson said. A Rescue 1122 team also gained access to the collapsed building's interior, where a search operation was underway. The authority’s urban search and rescue team continued looking for people who might be trapped beneath the debris, using specialised equipment and heavy machinery, the spokesperson added. Background The building stood on a 600-square-yard plot and had been approved in March 2026 for a basement, ground floor and one additional storey. However, six extra floors were allegedly added, turning it into a residential complex comprising more than 20 flats. The building had reached seven storeys despite the approved plan, with construction of a seventh floor reportedly under way for a penthouse when it collapsed. Around 30 labourers were reportedly inside the building at the time of the collapse. Rescue teams pulled 13 injured workers from the rubble and recovered three bodies. A local resident told The Express Tribune that construction of six floors had been completed on Tuesday and work had then begun on the seventh. He also said boring work was underway to extract underground water and that residents had experienced intense ground vibrations. Police detained five people, including the contractor responsible for the construction, for questioning. Meanwhile, the collapse prompted a wider crackdown on suspected illegal construction in the neighbourhood. The Sindh Building Control Authority sealed 12 other under-construction buildings in Administrative Society and began examining their ownership records, construction documents and approvals to determine whether they complied with building regulations.  

内容来自 The Express Tribune - CHECKED 01/07/2020,版权归原作者所有。

阅读原文 ↗

用 HomepageTab 新标签页关注 RSS,打开浏览器就能看到更新。

安装 HomepageTab