Plan to Cut Reliance on Imported Fuel and Boost Local Production
Published 1 min read
Upgrading the refineries is expected to save $1 billion in foreign exchange annually, according to OGRA.
ISLAMABAD, (Pakistan Point News - 25th Nov, 2026) A plan has been unveiled to upgrade five major oil refineries to reduce the country’s reliance on imported fuel and increase local production. A report citing an OGRA document says the investment will increase petrol and diesel output.
The upgrades are estimated to cost a total of $5.7 billion and are expected to save $1 billion in foreign exchange annually. Daily petrol production is projected to rise from 10,702 tonnes to 21,251 tonnes, while high-speed diesel output is expected to increase from 21,237 tonnes to 31,288 tonnes.
The target is to bring the quality of petrol and diesel produced at all refineries up to Euro 5 standards. The projects are expected to be completed between 2028 and 2030.
The upgrade of the PARCO refinery is estimated to cost $1.4 billion, with completion targeted for 2029.
Pakistan Refinery Limited’s upgrade is expected to cost $1.7 billion and is targeted for completion by 2028.
The National Refinery Limited upgrade is estimated to cost $1 billion, with completion targeted for 2029.
The Cnergyico refinery upgrade is expected to cost $1 billion and is targeted for completion by 2030.
An investment of $600 million is estimated for the Attock Refinery upgrade, which is targeted for completion by 2029.
内容来自 UrduPoint News,版权归原作者所有。
阅读原文 ↗