New Bridge Project Begins on Faisalabad’s Canal Road to Ease Congestion
The project includes a 100-by-85-foot bridge before Pipanwala Bridge. Once it opens, two existing bridges near Treat Bakery will be closed, according to a Faisalabad Development Authority spokesman.
FAISALABAD, (Pakistan Point News - 23rd Nov, 2026) Under special initiative and keen interest of Divisional Commissioner Faisalabad Dr Imran Hamid Sheikh, the development work has been commenced on a road remodeling project at a designated location along Canal Road to improve traffic management and remove bottlenecks.
A spokesman of Faisalabad Development Authority (FDA) said on Monday that under this project, a new dedicated bridge will be constructed over the canal before Pipanwala Bridge. Upon completion and becoming operational, both existing bridges currently being used for traffic near Treat Bakery will be closed.
This measure is expected to help reduce traffic pressure and congestion at the location, he added.
Meanwhile, Director General Faisalabad Development Authority (FDA), Muhammad Asif Chaudhary, reviewed the implementation of the bridge remodeling project and ongoing development activities along Canal Road.
Chief Engineer Mehr Ayub, Deputy Director Engineering Umar Iqbal and other relevant officers accompanied him during the visit.
DG FDA Muhammad Asif Chaudhary said that Divisional Commissioner Faisalabad Dr Imran Hamid Sheikh, is taking a keen personal interest in resolving the difficulties faced by citizens due to frequent traffic blockages and unusual congestion near Treat Bakery on Canal Road.
In this regard, a feasible traffic management plan was prepared through mutual cooperation and coordinated efforts of the relevant departments.
The remodeling design for the location was subsequently finalized and practical work on the project has now commenced.
He expressed the hope that the construction of the new bridge and the proposed remodeling of the traffic system would significantly improve traffic flow at this important point on Canal Road, facilitate commuters and help save valuable time otherwise wasted in traffic jams.
He directed the concerned officers to ensure the speedy completion of the development work within the stipulated timeline while maintaining the highest standards of quality and fully adhering to technical requirements.
He also emphasized the need for close liaison and effective coordination with all relevant departments to ensure the successful implementation of the project.
On this occasion, Chief Engineer Mehr Ayub briefed about technical details of the project.
He informed them that the new bridge to be constructed over the canal would measure 100 × 85 feet, providing a convenient, spacious and safe U-turn facility for traffic.
He explained that the construction of the new bridge would eliminate the excessive traffic pressure and congestion on the existing bridges near Treat Bakery. It would also help ensure smooth, uninterrupted and signal-free traffic flow along Canal Road.
He further said that completion of the project, designed in accordance with road and traffic engineering principles would improve the overall traffic management system and provide citizens with more convenient, organized and efficient commuting facilities in their daily routine.
内容来自 UrduPoint News,版权归原作者所有。
阅读原文 ↗