Rawalpindi speeds up drainage upgrades and footpath repairs across eight areas
The Rawalpindi Development Authority says crews are replacing damaged drainage lines and rebuilding footpaths, with inspections and traffic-related work also underway at sites including Banni Chowk and Pirwadhai.
RAWALPINDI, (Pakistan Point News - 23rd Nov, 2026) The Rawalpindi Development Authority (RDA) has accelerated work on drainage system improvement and footpath rehabilitation across the city to address water stagnation and drainage problems.
Construction teams are replacing old and damaged drainage lines with concrete-lined channels to ensure smooth wastewater flow. Damaged footpaths are also being reconstructed to provide safe passage for pedestrians.
The work is underway on Jamia Masjid Road, Banni Chowk, Waris Khan, Pirwadhai, Rawal Road, Chandni Chowk, Khayaban-e-Sir Syed and Asghar Mall Road.
Inspection teams are regularly visiting project sites to check construction quality and ensure compliance with engineering standards. Central dividers are also being adjusted at congested points, while municipal teams are removing construction waste to facilitate traffic movement.
内容来自 UrduPoint News,版权归原作者所有。
阅读原文 ↗