Rawalpindi ADC assures road work, anti-encroachment drive at Rawat Industrial Estate

Maleeha Sahar made the assurances during an inspection with a Rawalpindi Chamber of Commerce and Industry delegation. Industrial representatives also raised demands for emergency services and removal of a toll barrier.

RAWALPINDI, (Pakistan Point News - 22nd Nov, 2026) Additional Deputy Commissioner (ADC) Maleeha Sahar on Sunday assured the business community of swift action on constructing and carpeting the access road to Rawat Industrial Estate, carrying out road repairs in areas falling under the Capital Development Authority (CDA) jurisdiction, and launching operations to remove encroachments.

She gave these assurances while inspecting the connecting road from Chamber Chowk to Rawat Industrial Estate and reviewing on-site infrastructure alongside a Rawalpindi Chamber of Commerce and Industry (RCCI) delegation led by President Nosherwan Khalil Khan.

During a detailed briefing at the Rawat Industrial Management Board office, Board Chairman Nadeem Raouf apprised the ADC of pressing industrial challenges, including road construction and carpeting, encroachment clearance, provision of Rescue 1122 and fire brigade services, and removal of the toll tax barrier (Chungi).

RCCI President Nosherwan Khalil Khan and Chairman Nadeem Rauf thanked Deputy Commissioner Rawalpindi Captain (Retd) Nadeem Nasir for deputing a senior officer to assess the estate's issues firsthand and appreciated ADC Maleeha Sahar’s visit, also attended by RCCI Senior Vice President Waseem Aslam, Executive Member Aslam Naqash, Secretary General Irfan Manan Khan, and Imran Ali as a vital step toward resolving long-standing industrial concerns.

内容来自 UrduPoint News,版权归原作者所有。

阅读原文 ↗

用 HomepageTab 新标签页关注 RSS,打开浏览器就能看到更新。

安装 HomepageTab