Pre-Install Generator Wiring Audit
I have a generator wiring diagram that’s heading to the field shortly, and I’d like a fresh set of expert eyes on it before anything is cut, crimped, or landed. My main concern is catching wiring or control-logic mistakes now, rather than troubleshooting them after the install... (Budget: $10 - $30 USD, Jobs: Circuit Design, Control System Design, Electrical Engineering, Electronics, Microcontroller, Power Electronics & Battery Management (BMS), Power Generation, Technical Documentation)
内容来自 Freelancer News,版权归原作者所有。
阅读原文 ↗