Chamak Maira Dam to provide irrigation for about 3,000 acres in Abbottabad

Under construction on the Talashi River, the project includes a 12.3-kilometre main canal and a planned storage capacity of 1,943 acre-feet. The article gives its estimated cost as Rs113 billion.

ABBOTTABAD, (Pakistan Point News - 18th Nov, 2026) The Chamak Maira Dam Project, being constructed on the Talashi River in Abbottabad district, is expected to significantly improve water availability, boost agricultural production and support socio-economic development in the region.

The project, an Earth Core Rockfill Dam, was approved by the Provincial Development Working Party (PDWP) on June 26, 2019, with administrative approval granted on July 9, 2019. Construction activities were underway by January 2020.

The dam has a planned water storage capacity of 1,943 acre-feet. It also includes a main irrigation canal stretching approximately 40,500 feet (12.3 kilometers), which will provide irrigation facilities to around 3,000 acres of agricultural land.

With an estimated cost of Rs113 billion, the project is designed to strengthen the irrigation infrastructure and improve agricultural productivity in the surrounding areas.

Upon completion, the reservoir is expected to improve groundwater recharge, reduce farmers' dependence on seasonal rainfall and ensure better availability of water for agricultural purposes. The project is also likely to generate employment opportunities for local residents and promote tourism through the development of water-based recreational potential.

The Chamak Maira Dam is an important initiative towards water conservation, agricultural prosperity and sustainable economic development in Abbottabad district.

内容来自 UrduPoint News,版权归原作者所有。

阅读原文 ↗

用 HomepageTab 新标签页关注 RSS,打开浏览器就能看到更新。

安装 HomepageTab