Rawalpindi WASA starts winter preparations to upgrade water and sewerage systems

The phased citywide work includes maintenance of tube wells, replacement of filter media at public filtration plants and desilting of major sewer lines to support water supply and drainage.

RAWALPINDI, (Pakistan Point News - 18th Nov, 2026) Water and Sanitation Agency (WASA), under the directives of its management, has launched a comprehensive clean water supply and sewerage system upgradation initiative across the city in preparation for the upcoming winter season.

The phased development drive aims to streamline municipal water distribution, eliminate transmission leaks, and enhance the overall drainage infrastructure in both East and West zones.

Technical teams have begun the routine maintenance and mechanical overhauling of zonal tube wells, along with filter media replacements at public filtration plants, to ensure the uninterrupted supply of clean drinking water to residents.

Concurrently, field crews are executing targeted desilting and clearing of major sewerage lines to prevent urban drainage blockages during seasonal weather shifts. Senior administrative officers are conducting regular field visits to monitor engineering standards, project execution timelines, and service delivery across all active sites.

内容来自 UrduPoint News,版权归原作者所有。

阅读原文 ↗

用 HomepageTab 新标签页关注 RSS,打开浏览器就能看到更新。

安装 HomepageTab