Fluid machine project

$10-30 USD

Posted 36 minutes ago

•

Ends in 6 days

$10-30 USD

Paid on delivery

recent graduate from Bahrain polytechnic proposed the idea of installing a centralized chilled water plant to supply air-conditioning units at GPIC. The concept is based on operating the chilled water system during nighttime, when electricity demand and tariffs are lower and ambient air temperatures are cooler. Under these conditions, the refrigeration system can achieve a higher coefficient of performance (COP), making chilled water production more energy-efficient. The chilled water would then be stored and utilized during the daytime when cooling demand is at its highest. As part of this system, chilled water must be transported from the central plant to various air-conditioning units throughout the facility. To reduce engineering costs, GPIC has assigned the preliminary design work to undergraduate students undertaking their industrial work experience at the plant. In this project, you will act as the design engineer. Your design should include the following activities: • Pipe material selection • Pipe diameter selection • Pressure drop calculations • Centrifugal pump selection • Check valve selection • Venturi flow meter design The detailed requirements are outlined below. • You are to size the pipe lines and to select a suitable pump. The proposed piping layout is as per the attached schematic. • You are given details of the required lengths of pipes and the number of bends involved to get the chilled water to each of the cooling coils. There are isolating valves around each piece of equipment so that maintenance work can be carried out. • Select the appropriate check valves which must be fitted before each coil at the supply lines according to all the engineering parameters of the system. • You have also been asked to design a venturi flow meter, a form of flow measurement device, to be installed after the pump so that the total water flow can be measured on a continuous basis. You will need to demonstrate how the venturi will work. At the beginning of your presentation, include 1-2 slides describing the overall design and operation of a centralized chilled water plant. The slides should: • Identify the main components of the system (e.g., chillers, cooling towers, pumps, cooling coils, tanks, valves, and piping). • Explain the function of each component and how they work together. • Include suitable diagrams or images obtained from reputable online sources, with proper referencing. This section is intended to demonstrate your understanding of the complete chilled water system before presenting your detailed design calculations and pump selection. Step 1: Pipe Material Selection Select a suitable pipe material for the chilled water distribution system. Consider the following factors: • Operating temperature and pressure of the chilled water system • Corrosion resistance • Internal surface roughness • Mechanical strength and durability • Installation and maintenance requirements • Cost-effectiveness • Compatibility with chilled water applications Compare at least two suitable pipe materials (eg carbon steel, galvanized steel, copper, stainless steel, HDPE or PPR) and justify the final selection based on engineering and economic considerations. Step 2: Pipe Diameter Selection Using the required flow rates in the three cooling coils, determine suitable pipe diameters for: • The three parallel branches • The common supply and return lines Select pipe sizes such that the flow velocity is close to the value assigned by the tutor. Note: The tutor will assign a velocity range between 1.5 m/s to 2.5 m/s to differentiate individual student projects Step 3: Hydraulic Loss Calculations Calculate the hydraulic losses in each section of the system (parallel branches and common lines) by • Applying Bernoulli’s equation • Determining the flow regime (laminar or turbulent) • Obtaining friction data for the selected pipe material • Using the moody diagram to determine friction factors • Calculating friction losses • Using standard tables to determine losses due to fittings, valves, joints and bends Note: The total pressure drop ΔP provided for each coil branch includes the pressure loss across the fan coil unit, which is typically greater than the pressure losses in the piping system. Step 4: Pump Selection Select a centrifugal pump by determining • Pump type • Pump size • Pump efficiency • Required electric motor size When calculating the pump total head, assume: • The water levels in the chilled water supply and return tanks are equal. • The three cooling coil branches operate in parallel • Only the branch with the highest pressure drop (ΔP) needs to be considered. Note: You may use the lecture notes for pump selection, or select a suitable pump from a reputable manufacturer's catalogue available online. Ensure that the selected pump's specifications are included and properly referenced. Step 5: Pump Performance Curves Prepare the following graphs • Flow rate versus pressure drop (head) • Flow rate versus pump efficiency • Input power on the same graph Step 6: Final Pump Selection The selected pump may not always operate at its Best Efficiency Point (BEP) due to changes in the water levels of the chilled water supply and return tanks throughout the day. Assuming: • Static head = −8 m when the supply tank is full, • Static head = 0 m when both tank levels are equal, • Static head = +8 m when the return tank is full, Determine the pump flow rate, total head, and efficiency for each condition. Briefly discuss how changes in static head affect the pump operating point. Step 7: Valve Selection The provided piping schematic shows only the control valves. Review the system and identify locations where check valves should be installed. Add the check valves to the schematic and briefly justify their placement based on the operation of the chilled water system. 6 Discuss: • Selection criteria • Engineering considerations • Final valve selection • Roles and functions of the selected valves within the system Step 8: Venturi Meter Design Design a venturi meter to measure the total flow rate delivered by the pump. Provide: • A complete schematic drawing • Relevant dimensions • Design calculations • Operating principle • Expected efficiency • Pressure loss characteristics Step 9: Final Design Presentation Present the complete system design with all relevant calculations and engineering justifications. Step 10: References and Appendices Include: • All referenced tables and data sources • Calculation details • Intermediate design steps • Supporting information Presentation Requirements: The presentation should clearly demonstrate the complete engineering design process and include: • Executive Summary • Introduction • Pipe material Selection • Pipe Diameter Selection • Pressure Drop Calculations • Pump Selection and Performance Curves • Venturi Meter Design 7 • Check Valve Selection • Final System Design • Conclusions and Recommendations • References • Appendix (supporting calculations) Considering the above points • Prepare the presentation using Microsoft PowerPoint or any equivalent presentation software • The presentation must contain a minimum of 25 slides and a maximum of 30 slides

Project ID: 40823177

About the project

8 proposals

Open for bidding

Remote project

Active 16 mins ago

Place your bid

Bid amount Email address

Benefits of bidding on Freelancer

Set your budget and timeframe

It's free to sign up and bid on jobs

8 freelancers are bidding on average $18 USD for this job

User Avatar
Flag of PAKISTAN

I have experience in mechanical engineering, fluid systems, hydraulic calculations, and technical engineering documentation. I can develop your centralized chilled water distribution system design, covering pipe sizing, hydraulic losses, pump selection, valve selection, and Venturi flow meter design. I will provide a complete engineering study with clear calculations, technical justifications, and professional presentation slides. Deliverables: Chilled water system overview and operating principles. Pipe material comparison and selection. Pipe diameter sizing for all three branches and common lines. Flow velocity, Reynolds number, friction factor, and pressure drop calculations. Centrifugal pump selection and motor sizing. Pump performance curves (head, efficiency, and power). Operating point analysis under different static head conditions. Check valve selection and piping schematic updates. Venturi meter design, dimensions, and calculations. Complete 25–30 slide PowerPoint presentation. References, engineering calculations, and supporting appendices. Kind Regards.

User Avatar
Flag of PAKISTAN

I can develop a complete, technically sound presentation for your centralized chilled water plant project, covering pipe material and diameter selection, hydraulic losses, pump sizing, check valve placement, and venturi meter design. I will also structure the opening slides to explain how the full chilled water system works, with clear engineering language suited to an academic presentation. I will base the work on credible engineering principles and reputable references, then organize the calculations, comparisons, and justifications into a clean slide flow with proper formatting and concise explanations. The final deliverable will be a 25–30 slide PowerPoint-ready presentation with references and supporting calculation details. What is the assigned flow velocity range for your project? Best, Sonia

User Avatar
Flag of PAKISTAN

I hold a degree in Computer Science and have handled complex, large-scale projects where structured documentation, process organisation, and clear communication were essential. I can help turn the centralized chilled-water concept into a professional, logically organised project deliverable covering the system overview, component functions, design decisions, calculations, and engineering justification. My experience with Microsoft Visio is especially relevant for preparing clear system schematics and diagrams, while my project-management background supports consistent organisation of the pipe-material comparison, diameter selection, hydraulic-loss work, pump and valve selections, and Venturi-meter explanation. I am committed to producing a polished, technically structured presentation that communicates the design clearly and professionally. Choose me to bring strong project organisation, visual documentation, and a dependable engineering-project workflow to this assignment.

User Avatar
Flag of INDIA

My mechanical engineering background and 6 years of professional product design experience make me well suited to develop the engineering design for your centralized chilled-water distribution system. I can apply mechanical engineering principles to the pipe material comparison, diameter sizing, hydraulic-loss evaluation, and equipment selection required for the three cooling-coil branches and common lines. My experience with technical drawings and 3D modeling in SolidWorks, AutoCAD, Fusion 360, and Blender also supports clear presentation of the proposed piping layout, plant arrangement, and system components. I can present the chilled-water plant operation and produce an organized engineering submission covering the pipe network, pump, check valves, and Venturi flow meter design. I am ready to contribute a practical, technically structured design that connects the calculations with the actual operation and maintainability of the system. Choose me to develop this fluid-machine project with professional engineering presentation and documentation.

User Avatar
Flag of PAKISTAN

Hi, I am a professional writer and research specialist with 6+ years of experience in Project Management, Mechanical Engineering, Computational Fluid Dynamics, Mechanical Design, Thermodynamics. I have carefully reviewed your project requirements and would be glad to assist you in delivering high-quality, accurate, and professionally presented work. I focus on understanding each client's specific needs, following instructions carefully, maintaining attention to detail, and delivering results within the agreed timeline. My priority is to ensure quality, reliability, and client satisfaction throughout the project. Past Projects: https://www.freelancer.com/u/QuickMentor I would welcome the opportunity to discuss your project further. Let's connect via chat to discuss the requirements! Abdur Rehman

User Avatar
Flag of PAKISTAN

Thank you for the detailed brief. Your project asks for a complete hydraulic design of a chilled water distribution network: pipe material and diameter selection for three parallel coil branches and common lines, Darcy-Weisbach and Moody-based pressure drop calculations, centrifugal pump selection with performance curves, check valve placement, a venturi meter design, and a 25 to 30 slide presentation. Our team at Shazia Works focuses on AutoCAD, Revit BIM, MEP drafting and 3D visualization, and we do not provide thermofluid analysis or pump selection calculations, so we are not the right fit for the engineering content here. If you need only the schematic redrawn with check valves and the venturi layout as a clean AutoCAD drawing, or the presentation slides formatted with diagrams, we can help with that part on a fixed-price basis. Shazia, Shazia Works

User Avatar
Flag of BRAZIL

HELLO, CLIENT. I have reviewed the project details regarding the centralized chilled water plant design, including pipe sizing, hydraulic loss calculations, pump selection, and venturi meter design. I worked for a long time at a domestic software and engineering company and recently started freelancing because the company's situation worsened. Although I have no freelancing experience yet, I can technically guarantee and vouch for your mechanical design project. Could you please share any specific schematic drawings or velocity ranges assigned by your tutor? I hope we can have an opportunity to discuss the task via chat.

User Avatar
Flag of JAPAN

HVAC system layouts and piping design are central to my mechanical engineering services, making this chilled-water distribution project a strong match for my expertise. I can support the complete design from centralized plant understanding through pipe material comparison, branch and common-line sizing, hydraulic-loss calculations, pump selection, check-valve selection, and Venturi flow-meter design. My experience covers piping and mechanical system coordination, mechanical equipment layouts, material selection, technical specifications, and engineering documentation. I can present the chilled-water plant’s chillers, pumps, cooling towers, tanks, coils, valves, and piping clearly, then develop the supporting calculations using Bernoulli’s equation, flow-regime assessment, friction factors, Moody-chart data, and minor-loss evaluations. My CAD capabilities with AutoCAD, Revit, SolidWorks, Autodesk Inventor, and Autodesk CFD also support clear schematics and professional presentation drawings. I can deliver a technically structured design package that connects the calculations with practical HVAC operation and equipment selection. Choose me to develop your chilled-water system project with clear engineering justification and professional documentation.

内容来自 Freelancer News,版权归原作者所有。

阅读原文 ↗

把喜欢的内容,留在你的新标签页。

打开我的订阅