Rawalpindi Division to Install 706 Water Filtration Plants by November 30
A meeting chaired by Commissioner Salman Ghani was told the installations would span six districts. Officials also reported that 284 of 376 existing plants were functional, with work underway to restore the rest.
RAWALPINDI, (Pakistan Point News - 17th Nov, 2026) Commissioner Rawalpindi Division Salman Ghani on Tuesday chaired a review meeting on clean drinking water provision and the performance of water filtration plants across the division.
Deputy Commissioner Rawalpindi Nadeem Nasir, Managing Director WASA, Director Local Government, representatives of the Clean Water Authority and officers of other concerned departments attended the meeting.
Participants received a detailed briefing on the supply of safe drinking water, the functioning of existing filtration plants, and ongoing projects. The meeting was informed that 706 new filtration plants would be installed across Rawalpindi Division by November 30, 2026.
Of these, 138 plants would be installed in Rawalpindi district, 119 in Jhelum, 249 in Attock, 72 in Chakwal, 50 in Murree and 78 in Talagang.
The meeting was further informed that 376 filtration plants were already operational or installed across the division, of which 284 were functional while 92 remained inactive. Work was underway to restore the non-functional plants.
The commissioner directed the concerned departments to compile comprehensive district-wise data of all filtration plants, identify the reasons for their inactivity and set clear timelines for their restoration.
He emphasised regular water quality testing, timely replacement of filters and proper maintenance of machinery to ensure the supply of safe drinking water. He also directed that geo-tagging, GPS monitoring, daily inspections and the citizen feedback system be made effective.
Ghani made it clear that no complaint should be closed without verification from the complainant and confirmation that the issue had been resolved.
He directed all departments to ensure close coordination, submit regular progress reports and take effective measures to provide clean drinking water to residents in every area.
Citizens can register complaints regarding water filtration plants by calling helpline 1336.
内容来自 UrduPoint News,版权归原作者所有。
阅读原文 ↗