Rainwater Prefilter Hydraulic Verification

€30-250 EUR

Posted 3 minutes ago

•

Ends in 6 days

€30-250 EUR

Paid on delivery

I need a hydraulic engineer to verify and finalise a custom rainwater prefilter before fabrication, for a residential rainwater harvesting system in Italy. The installation has two separate drainage lines, each serving approximately 250–260 m² of roof and feeding its own Rototec CI8300 storage tank. Each tank has a Rototec Compact self-cleaning filter with Ø125 connections. The scope covers both prefilters, F1 and F2. They use the same operating concept. Proposed configuration of each prefilter: - Circular chamber, approximately 790 mm internal diameter. - Ø200 inlet, internal pipe invert at +410 mm. - Ø200 bypass outlet, opposite the inlet, invert at +380 mm. - Ø160 filtered-water outlet, positioned 90° from the inlet/bypass axis, invert at +300 mm. - All these elevations are measured from the internal chamber floor. - Removable cylindrical stainless-steel mesh between inlet and bypass, approximately Ø200 × 690 mm long. Water passes through the mesh into the surrounding chamber; debris continues towards the bypass. - Filtered-water connection: 1 metre of Ø160 pipe at 1% slope, followed by an eccentric Ø160→125 reduction with aligned pipe inverts, entering the tank’s Compact filter. - The Compact reject/bypass outlet is Ø125 and joins the external bypass drainage downstream. - Two separate discharge pipelines run approximately 50 metres towards a ditch, with an available slope of approximately 0.5–0.6%. Main objective: Keep the discharge to the ditch as high as practicable while obtaining a quantified, acceptable rainwater recovery rate. Maximum collection efficiency is not mandatory, but the trade-off must be calculated. Required checks: 1. Verify the proposed inlet, bypass and filtered-outlet elevations. 2. Calculate the flow split between filtered water and direct bypass over a range of incoming flows. 3. Include mesh losses, partial blockage, entrance losses, pipe friction, fittings, the reduction and the downstream Compact filter. 4. Assess whether turbulence and direct flow through the cylindrical mesh cause excessive water loss to bypass. 5. Check the downstream Ø125 bypass connection and identify conditions that could cause backflow. 6. Identify any missing manufacturer data or measurements needed before final approval. Deliverables: - Calculation report stating assumptions, methods and limitations. - Flow table showing inlet flow, flow reaching storage and bypass flow. - Dimensioned plan and section showing recommended pipe invert elevations. - Recommended mesh specification and any necessary geometry changes. - Practical commissioning test procedure. I will provide existing drawings, drainage calculations, site elevations, photographs and available manufacturer documentation. Please describe relevant experience with gravity drainage, rainwater harvesting and self-cleaning filters. Explain your proposed calculation method and whether physical testing or manufacturer performance data will be required. Please quote a fixed price and delivery time.

Project ID: 40822371

About the project

2 proposals

Open for bidding

Remote project

Active 2 mins ago

Place your bid

Bid amount Email address

Benefits of bidding on Freelancer

Set your budget and timeframe

It's free to sign up and bid on jobs

2 freelancers are bidding on average €185 EUR for this job

User Avatar
Flag of PAKISTAN

Verifying F1 and F2 before fabrication makes sense. In a 790 mm chamber with the inlet at +410, bypass at +380 and the Ø160 filtered outlet at +300, the flow split depends on how much water passes through the mesh before reaching the bypass. My method: weir and orifice equations for the mesh and outlets, plus Darcy-Weisbach and fitting losses for the Ø160 run, the 160→125 reduction and the Compact filter. I'd run these across a flow range with clean and partly blocked mesh. Then I'd check the Ø125 Compact reject junction for backflow from the 50 m lines at 0.5–0.6%, and deliver the flow table, sections and a commissioning test. Manufacturer data is essential. A timed-volume test at commissioning would confirm the split. Our Freelancer record: 145 completed projects, 4.96 stars from 121 reviews. Can you provide the Rototec Compact filter head-loss curve and the mesh open-area or aperture data before I start the calculations? Usama M Modular Solutions

User Avatar
Flag of PAKISTAN

Hydraulic verification risk: The dual Rototec CI8300 lines risk backing up at the Ø125 connections before reaching the 50-metre ditch discharge. I run energy grade-line calculations in StormCAD to check peak flow velocity through the Ø200 × 690 mm mesh. Over 26 years of industry experience, with 5 stars on every job completed here. Before I start we agree a short pass/fail checklist, and payment releases when the delivered work passes it. Will the peak discharge to the ditch be governed by the 0.5% pipe slope or the ditch invert level?